AD SPACE HERE

James Cook’s $100m STEM Precinct Fuels Timber-led Campus Development

James Cook university is the latest university to turn to mass timber construction systems, including cross-laminated timber and glulam, to build future campus buildings.


Thu 22 Feb 24

SHARE

James Cook University unveiled its new “game-changing” campus after JCU Vice Chancellor Simon Biggs welcomed its first cohort of STEM students to its new $100m Engineering and Innovation Places (EIP).

The four-storey, 9,400-square-metre building incorporates 23 new lab spaces, industry engagement and garage space, workshops and multi-modal studio and conference rooms, all housed under a roof that uses Queensland manufactured glulam timber.

The four-storey, 9,400m2 TIC will be the centrepiece of an innovation hub where undergraduate and postgraduate engineering and IT students, industry partners and researchers will converge and collaborate – footage courtesy of @jamescookuniversity.

It comes as enrollments in engineering courses have surged in recent years, with JCU reporting that enrollments in engineering-related courses are “up more than 49%,” with the EIP “no doubt enhancing the learning experience for those students.”

image 6483441 12
JCU third-year mechanical engineering students Mitchell Greenland and Ethan Moody. (Photo Credit: Supplied)

Professor Biggs said, “The EIP is a game changer for our students and academics, offering unparalleled access to resources and equipment being used in the industry right now.”

“Whether you are studying information technology, engineering, mathematics or any number of related fields, EIP will be a focal point for innovation where students will be able to push the boundaries of what is possible,” he said.

1686284268367
JCU TIC Atrium, including the Oculus (skylight) and cantilevered Stairs, is under construction. (Photo Credit: Supplied from Linkedin)

Designed by KIRK Studio, in collaboration with local architects i4 Architecture and Charles Wright Architects, the campus was constructed by BESIX Watpac and features a “parasol roof of folded glulam timber panels, an innovation climate control system and a gold sustainability rating.”

According to KIRK Architects, the approach to the building was to make a building that redefines what it means to build in the tropics – “by allowing the façade to be entirely transparent from within and without relying on a large dramatic parasol roof conceived as a series of folded (wooden) plates.”

The objective is, therefore, to “create a new sustainability benchmark for tropical buildings and the tropical campus,” allowing engineering and allied disciplines to celebrate, collaborate, create, learn, innovate and sustain, all within an integrated technical landscape derived from state-of-the-art performative design tools.

image 6483441 11 2
JCU Head of Engineering Professor Bouchra Senadji, Deputy Vice Chancellor, Services and Resources Tricia Brand and College of Science and Engineering Dean Professor Ron White. (Photo Credit: Supplied)

JCU Deputy Vice Chancellor for Services and Resources, Tricia Brand, said the modern design and function of the building were “cutting edge” and contained several innovative features well suited to North Queensland’s tropical climate – with JCU Head of Engineering, Bouchra Senadji saying the new building “provides a rich environment for our students to engage, learn and grow.”

JCU Starts Timber-Rich $50m Cairns Tropical Enterprise Centre

The new building comes as JCU last year broke ground on its Tropical Enterprise Centre, the first building as part of Cairn’s $350m Dugurrdja Precinct.

image 50
The $50 million project is the first piece of the puzzle in the Far North Queensland Health Innovation Precinct, with the centre to stand adjacent to a new 32-bed surgical centre near the Cairns Hospital campus. (Image Credit: Renders Supplied by James Cook University)

Designed by Wilson Architects, in collaboration with Clarke & Prince Architects, BESIX Watpac has been appointed as the principal contractor for stages 1 and 2, with the building on track to open in early 2025.

In June last year, JCU released updated artists’ impressions of the CTEC building, revealing a striking four-storey glulam and cross-laminated timber building which, according to BESIX Watpac, “will be innovative in design to achieve Green Star recognition.”

More than $350 million has been committed to developing the Cairns Hospital, which includes a new surgical centre, emergency department and mental health building.

Author

  • Jason Ross

    Jason Ross, publisher, is a 15-year professional in building and construction, connecting with more than 400 specifiers. A Gottstein Fellowship recipient, he is passionate about growing the market for wood-based information. Jason is Wood Central's in-house emcee and is available for corporate host and MC services.

spot_img

Related Articles